ELEVATOR INDUSTRY CHALLENGES

INAPPROPRIATE DESIGN

  • Unoptimized Vertical circulation cores, thus, wasting useable building space
  • Design based on thumb-rules, past references, thus, prone to errors
  • Inaccurate Lift capacities, speeds, Escalator sizes, etc.
  • Inaccurate hoist way sizes resulting in limited competition
  • Wrongly specified critical dimensions – Overheads, Pit depths, Tolerances, etc.
  • Conflicting specifications with Codes, standards, building by-laws
  • Design attracting customized products

GENERAL & NON-FUTURISTIC SPECIFICATIONS

  • Brief specifications limited to Capacity, speeds, aesthetics only
  • Specifications with obsolete technologies
  • Vendor specific details limiting competition
  • Limited or No specifications on code and safety requirements
  • Specification without performance parameters, latest trends, future proofing
  • No requirements on Energy efficiency, Sustainability, Design life
  • No SLA covering critical aspects of execution and maintenance

INCOMPLETE DRAWINGS

  • Inadequate information for execution
  • Wrong dimensional details
  • Drawings non-compliant to order specification
  • Non compliant fixtures and their placement as per accessibility codes
  • Unfavorable scope of work for Builder / Client

UNPLANNED EXECUTION

  • Deliveries without actual site requirement
  • No pre-execution site visits and measurements
  • Improper site readiness before execution
  • Improper storage and handling
  • No consideration on in-stage quality reviews
  • No consideration on milestones and project timelines

NON-COMPLIANT COMMISSIONING
AND HANDING OVER

  • No checks on safety compliance
  • No checks on Code compliance
  • No checks on technical specification compliance
  • No checks on performance parameter compliance
  • Poor quality standards
  • Poor ride quality of executed produc
  • No checks on damages during execution

INADEQUATE MAINTENANCE

  • Poor or no maintenance plan
  • No records of maintenance activity
  • No checks for component life cycle
  • Poor housekeeping
  • Poor spare management with long lead times of repairs
  • Long lead times for attending call backs
  • No tracking of complaints, equipment uptime and shut downs